Building Project Updates

Last Updated: 3/3/2022 4:01 PM

Time Lapse Progress


September Community Update Video

September Drone Flyover

Photo Gallery

Ground Breaking moving the concession stand Construction Construction Construction construction construction construction construction construction . . CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION construction construction construction construction construction Construction Construction Construction Construction construction construction Construction Construction Construction Construction Construction Construction construction construction construction construction construction construction construction Construction Construction Construction Construction Construction

 


Check out this animated fly through of the dome project!


Ground Breaking

We are breaking ground!  A ceremony was held on Wednesday, September 2 to break ground on the dome.  Pictured are members of the current and most recent past school board, the village of Spencer, and District Administrator Mike Endreas.   

Ground Breaking-1      Ground Breaking-2



Rendering of dome project before we started

Dome

 

 

Proposed Floor Plan

Floor Plan

 
 
 

 

Elementary Office

  • Entrance was not centrally located
  • Had an unnatural entrance- seemed like a side door
  • No receiving area
  • Visitors were not restricted once buzzed in
  • Vestibule area was not visable

Current Elementary Office

 

 

Elementary Safety Updates

  • Relocate Elementary Office To Centralized Location
  • Create a Vestibule Receiving Area 
  • Visitors Must Sign In

Elementary vestibule

Elementary Office

 

 

Old FCS Room

  • Built in 1964
  • Outdated Equipment
  • No Commercial Lab
  • Asbestos Flooring
  • Inadequate HVAC

Old FCS Room

New FCS Room

  • Remove Asbestos (Last Known in Building)
  • Independent HVAC
  • New cabinets and equipment
  • New lab areas with a commercial kitchen station

Proposed rendering:

New FCS Room

New facility:

 

 

 

 

 

Current Handbell Room

  • Currently In random classroom
  • changes year to year
  • No storage space

Old Room:

Current Handbell Room

New Handbell Room

  • 634 square feet
  • Choir director office
  • practice rooms

Proposed rendering:

Proposed Handbell Room

New facility:

handbell room

 

 

Current Choir Room

  • Currently share space with LTCA and band room
  • Equipment hauled between spaces
  • Inconsistent learning environment
  • Inadequate storage

Proposed Choir Room

  • 1,766 square feet
  • U-shaped risers
  • 95 student capacity
  • close proximity to band room

Choir room

New Facility:

 

Old Gymnasium

  • Built in 1957
  • Only boys' high school sports existed when built
  • Inadequate space
  • Creates scheduling bottleneck for physical education

Current Gym

Proposed Gymnasium 

  • Full size court
  • Two full width secondary courts
  • Large lobby entrance
  • Concession stand
  • Public restrooms

NEW GYM

 

New Facility:

dome gymnasium

 

Current Wrestling/Multipurpose Room

  • Shares space with elementary physical education
  • Located in elementary area
  • Mats stay down during the winter

Current Wrestling Room

Proposed Wrestling/Multipurpose Room

  • 2,804 Square Foot Room
  • Dedicated wrestling space
  • Lockable space
  • Mop sink area for mat sterilization

Proposed Wrestling Room

New Facility:

Wrestling room

 

 

 

Current Weight Room:

  • Not a safe environment
  • Inability to lock it
  • Weights are on a wooden stage
  • Fitness and Weights is our most popular physical education class

Proposed Strength and Cardio Center:

  • 3,540 Square Feet
  • Restrooms and Showers
  • Community Access
  • New Equipment

Proposed Strength and Cardio Center

New Facility:

weight room